19
Jan
Mobile CSSD for Hospital in Tilburg, Netherland
A mobile CSSD consisting of 5 units with a gross floor [...]
Read MoreA mobile CSSD consisting of 5 units with a gross floor [...]
Read MoreA mobile CSSD was installed on a playground within the hospital [...]
Read MoreSince the refurbishment of the existing CSSD department will take two [...]
Read MoreThe first delivery of hospital equipment took place in May 2018. [...]
Read MoreIn order to make better use of the surgical area, the [...]
Read MoreAbout 290,000 mothers die from complications during pregnancy or childbirth each [...]
Read MoreHolistic systems for temporary installation during the renovation of an existing [...]
Read MoreDue to the need for rehabilitation of the two existing CSSD [...]
Read MoreThird construction phase of the Adamawa German Medical Center (AGMC) agreed [...]
Read MoreIn addition to the contract for the construction of a Diagnostic [...]
Read More