Donau Isar Hospital Deggendorf (2018)

Donau Isar Hospital Deggendorf (2018)


Project Description

Modular CSSD with connecting to hospital elevator for connection with the hospital.

  • Gross floor space:

    192 m2

  • Capacity per year:

    50.000 – 60.000 StU

  • Location:

    Deggendorf, Germany

  • Client:

    Donau Isar Hospital Deggendorf