Klinik Mallersdorf (2020)

Klinik Mallersdorf (2020)


Project Description

Modular CSSD. Made with steel-frame modular construction technology. With connecting corridor to the existing hospital.

  • Gross floor space:

    150 m2

  • Capacity per year:

    30.000 – 40.000 StU (with option for extension)

  • Location:

    Mallersdorf, Germany

  • Client:

    Kreisklinik Mallersdorf