Modular CSSD. Made with steel-frame modular construction technology. With connecting corridor to the existing hospital.
-
Gross floor space:
150 m2
-
Capacity per year:
30.000 – 40.000 StU (with option for extension)
-
Location:
Mallersdorf, Germany
-
Client:
Kreisklinik Mallersdorf